Trees, Slopes and What You Can Build on a Sammamish Lot


The Sammamish tree removal rules cap how many significant trees you may take off a lot over a ten year period, and the cap is set by lot size rather than by what you intend to build. Add the landslide buffer on sloped ground and the hardscape ceiling on every residential zone, and a Plateau lot often allows less than its acreage suggests.

This is the part of a Sammamish purchase that buyers tend to discover after closing. A property looks like room for a larger footprint, a shop, a sport court or a second structure, and then the code narrows it. None of it is hidden. It is published by the city and it is readable before you write an offer.

Here is what governs a Sammamish lot, in the order it will affect you.

The Short Answer for Sammamish Buyers

  • A Tree Removal Permit is required to remove significant trees anywhere in the city, under the Sammamish tree removal rules published by the Permit Center and codified at SMC 21.03.060
  • A significant tree is a conifer 8 inches DBH or larger, or a deciduous tree 12 inches DBH or larger. DBH means diameter at breast height
  • The removal allowance runs three ways at once, a percentage over ten years, an annual number and a cumulative ten year number, and whichever column is lowest governs
  • On a site where development is proposed or anticipated, no trees come down until a construction permit has been issued, under SMC 21.03.070.I.2.b
  • Landslide hazard areas carry a minimum 50 foot buffer from both the top and the toe of the slope, reducible or removable only on the strength of a critical areas study
  • Maximum hardscape is set by zone, 30 percent in R-1 and 40 percent in R-4, with Public Works stormwater rules applying on top of that
  • Six categories of critical area are regulated in Sammamish, and more than one can land on a single parcel

What the Sammamish Tree Removal Rules Actually Say

The city's Permit Center tree removal page publishes the Sammamish tree removal rules directly, and the operative code section is SMC 21.03.060. Two definitions do most of the work.

The first is the significant tree. A coniferous tree is significant at 8 inches diameter at breast height or larger. A deciduous tree is significant at 12 inches or larger. Below those thresholds a tree is not counted in your allowance. At or above them it is, and a Tree Removal Permit is required to remove it. A tree standing in the street right of way is a separate matter and takes a Type B Right of Way permit rather than a tree permit.

The second is the allowance itself, and it is the one people misread. It is not a single number. It is three limits applied simultaneously, and the city states plainly that the number of significant trees allowed for removal is limited to whichever of the three columns is lowest.

How Many Trees You Can Remove, by Lot Size

The schedule reads as percentage over ten years, then annual number, then cumulative number over ten years.

  • Less than 1/4 acre. 50 percent over ten years, 2 per year, 6 cumulative over ten years
  • 1/4 to 1/2 acre. 40 percent over ten years, 4 per year, 12 cumulative over ten years
  • 1/2 to 1 acre. 30 percent over ten years, 6 per year, 18 cumulative over ten years
  • 1 to 2 acres. 20 percent over ten years, 8 per year, 24 cumulative over ten years
  • More than 2 acres. 10 percent over ten years, 10 per year, 30 cumulative over ten years

Work an example on a half acre lot in the 30 percent row. If the parcel holds 20 significant trees, the percentage column allows 6, the annual column allows 6 in a given year and the ten year cumulative column allows 18. The lowest applicable figure controls, and the ten year window matters as much as the number. A previous owner who took trees down recently has already spent part of the allowance you would inherit.

Larger parcels are where the arithmetic surprises people. The percentage tightens as lot size grows, so acreage buys you fewer removals per tree standing, not more. Our guide to Sammamish horse properties and acreage covers the rest of what changes when a parcel gets large.

If a specific lot is on your list and the tree count matters to your plans, that is worth checking before the inspection period closes. Reach out to The Van Pelt Group or call (206) 290-8233.

The Sequencing Rule That Changes Your Whole Timeline

One line in the code reorders every plan that involves construction. Under SMC 21.03.070.I.2.b, on sites where development is proposed or anticipated, removal of any trees shall not take place until a permit for construction has been issued.

Read that carefully, because it runs against the instinct. You cannot clear the lot and then design around the space you opened. The design comes first, the construction permit comes first, and the trees come down after. That sequence lengthens the front end of a rebuild or a major addition, and it means the trees standing on the lot are a design input rather than an obstacle you remove early.

It also means a lot marketed as ready to build is worth a question. Our guide to teardowns and custom rebuilds in Sammamish walks through the rebuild decision itself, and our builder guide covers what to ask a builder about their own permitting assumptions.

Steep Slopes and the 50 Foot Landslide Buffer

Sammamish sits on a plateau with real grade changes at its edges, which puts geologically hazardous areas on a meaningful share of parcels. The city groups landslide hazard areas, steep slopes and erosion hazard areas together in that category.

The number to know is 50 feet. In a landslide hazard area, the city requires a minimum buffer of 50 feet established from the top and the toe of the slope, to protect structures that could be affected by a landslide event. Both ends, not one. A slope crossing the middle of a parcel can therefore consume buffer in two directions.

The buffer is not fixed in either direction. The city may extend it to mitigate a landslide or erosion hazard or to protect public health and safety. It may also be reduced or removed based on a critical areas study, if the city determines the critical area will still be adequately protected. Which of those applies to a given parcel is a question for a qualified geotechnical professional, and the city notes that field verification and site specific assessment are what delineate these areas and their buffers in the first place. A published hazard map is a starting point, not an answer.

The Other Critical Areas on the List

Geologic hazards are one of six regulated categories. Sammamish also regulates critical aquifer recharge areas, frequently flooded areas, habitat conservation areas and migration corridors, streams, and wetlands.

Two things follow from that list. First, a single parcel can carry more than one designation, and the constraints stack rather than cancel. Second, buffers for streams and wetlands are set by classification, which is determined on the ground by a qualified professional rather than read off a map. If a lot has water on it or near it, budget time in your contingency period for someone to look at it.

This is also where the utilities question tends to surface on the less developed parts of the Plateau. Our guide to buying a Sammamish home with a septic system or well covers the drainfield and water side of the same diligence.

How Much of the Lot You Can Cover

Trees and slopes limit what you can clear. Hardscape limits govern what you can then cover. The city publishes maximum hardscape by residential zone under SMC 21.04.030.C, with surface water management at SMC 21.03.050 layered on top.

  • R-1. 30 percent maximum hardscape
  • R-4. 40 percent
  • R-6. 50 percent
  • R-8. 75 percent
  • R-12 and R-18. 85 percent

Hardscape here is broader than the house. The city counts buildings, driveways, walkways, decks and any other area not designed for the growth of vegetation, and it specifically counts gravel, pavers and similar quasi hardened surfaces. The calculation is simply hardscape divided by lot size. A long driveway on a large-lot R-1 parcel can absorb more of a 30 percent ceiling than owners expect, before a shop or a sport court is drawn at all. Public Works stormwater regulations apply in addition to these percentages, so meeting the zone ceiling is not automatically the end of the analysis.

If your interest is what a renovation returns rather than what it costs to build, our look at which remodeling projects return value in Sammamish is the companion piece to this one.

Middle Housing Overlays and What They Change

Sammamish has mapped middle housing overlays, designated MHO-1, MHO-2 and MHO-3, across the R-1 through R-8 zoning districts. The city's own framing is that middle housing is not mandatory but is encouraged, through increased density allowances and tiered floor area ratios. Development under the overlays is subject to the city's Mandatory Affordable Housing Program, with units under 1,500 square feet exempt from the affordable housing calculation.

For a buyer, the practical read is narrow and worth keeping narrow. An overlay may expand what a parcel could hold. It does not suspend the tree allowance, the landslide buffer or the critical areas review, and the overlay assignment is parcel specific. Confirm the overlay for an address with the Permit Center rather than assuming from the zone.

What the Sammamish Tree Removal Rules Mean for Your Offer

Turn all of it into diligence you can actually run inside a contingency period.

  • Count the significant trees before you plan around them. Walk the lot with the DBH thresholds in mind, conifer at 8 inches and deciduous at 12
  • Ask what has already been removed. The allowance runs on a ten year window, and it does not reset at closing
  • Check the parcel for critical area designations early, since geologic hazards, streams and wetlands each bring their own study requirement
  • Look for grade at the property edges, then measure 50 feet in from the top and the toe before you draw anything
  • Run the hardscape math on your zone, including driveway, walkways, decks and gravel, not only the house footprint
  • If construction is the plan, build the permit sequence into your timeline, because no trees come down before the construction permit issues
  • Take site specific questions to the people who answer them, which means the Sammamish Permit Center, a certified arborist and a qualified geotechnical professional

A lot with slope, trees and a stream is not a bad lot. It is a lot with a longer diligence list, and the buyers who run that list before the offer are the ones who do not find out in month three. Views on the Plateau often come from exactly the grade that carries a buffer, which our guide to Sammamish view homes gets into.

The Van Pelt Group has worked the Sammamish Plateau for more than 30 years across two generations, and land use questions come up on a real share of the lots we tour. We will help you read a parcel before you write, flag where a study is likely to be needed, and connect you with the arborist or geotechnical professional the question actually calls for. Call (206) 290-8233 or visit our contact page.

Frequently Asked Questions About Sammamish Tree Removal Rules

Do I need a permit to remove a tree in Sammamish?

Yes, if the tree is significant. The Sammamish tree removal rules published by the city's Permit Center require a Tree Removal Permit to remove significant trees anywhere in the city, under SMC 21.03.060. A tree is significant when a conifer measures 8 inches diameter at breast height or larger, or a deciduous tree measures 12 inches or larger. Trees below those thresholds are not counted in the allowance. A tree located in the street right of way is handled differently and requires a Type B Right of Way permit instead.

How many trees can I remove from my Sammamish lot?

It depends on lot size, and three limits apply at the same time. The schedule runs as a percentage over ten years, an annual number and a cumulative ten year number. A lot under 1/4 acre is at 50 percent, 2 per year and 6 over ten years. A 1/4 to 1/2 acre lot is at 40 percent, 4 and 12. A 1/2 to 1 acre lot is at 30 percent, 6 and 18. A 1 to 2 acre lot is at 20 percent, 8 and 24. A lot over 2 acres is at 10 percent, 10 and 30. The city states that the number allowed for removal is limited to whichever of those columns is lowest.

Can I clear a Sammamish lot before I build on it?

No. Under SMC 21.03.070.I.2.b, on sites where development is proposed or anticipated, removal of any trees shall not take place until a permit for construction has been issued. The design and the construction permit come first, and the tree removal follows. That sequence is the single most consequential item in the Sammamish tree removal rules for anyone planning a rebuild or a major addition, because it puts permitting on the front of the timeline rather than the middle.

What is the buffer for a steep slope in Sammamish?

In a landslide hazard area, which includes steep slopes, the city requires a minimum buffer of 50 feet from both the top and the toe of the slope, to protect structures that may be affected by a landslide event. The buffer can be extended where needed to mitigate a landslide or erosion hazard or to protect public health and safety. It can also be reduced or removed based on a critical areas study, if the city determines the critical area will still be adequately protected. Delineating the hazard area and its buffer requires field verification by a qualified geotechnical professional.

How much of my lot can be covered by hardscape?

The maximum is set by zone under SMC 21.04.030.C. R-1 allows 30 percent, R-4 allows 40 percent, R-6 allows 50 percent, R-8 allows 75 percent, and R-12 and R-18 allow 85 percent. Hardscape includes buildings, driveways, walkways, decks and any other area not designed for growing vegetation, and gravel and pavers count toward the total. The calculation is hardscape divided by lot size. Public Works stormwater regulations under SMC 21.03.050 apply in addition to these percentages, so a project can meet the zone ceiling and still have surface water requirements to satisfy.

What critical areas does Sammamish regulate?

Six categories. Critical aquifer recharge areas, frequently flooded areas, geologically hazardous areas including landslide, steep slope and erosion hazards, habitat conservation areas and migration corridors, streams, and wetlands. A single parcel can carry more than one designation and the requirements stack. Stream and wetland buffers depend on classification, which is determined by on site assessment rather than read from a map, so a lot with water on or near it needs qualified eyes during the contingency period.

Do the middle housing overlays change the Sammamish tree removal rules?

No. The city has mapped middle housing overlays, MHO-1, MHO-2 and MHO-3, across the R-1 through R-8 zoning districts, and describes middle housing as not mandatory but encouraged through increased density allowances and tiered floor area ratios. Development under the overlays is subject to the Mandatory Affordable Housing Program, with units under 1,500 square feet exempt from the affordable housing calculation. What an overlay can change is how much a parcel may hold. It does not set aside the tree allowance, the landslide buffer or critical areas review, and overlay assignment is parcel specific, so confirm it for a given address with the Permit Center.

How do I check these rules for a specific Sammamish address?

Start with the City of Sammamish Permit Center, which publishes the tree, critical areas and development standards pages and can confirm the zone and any overlay for a parcel. For the tree count itself, a certified arborist can size and inventory significant trees on the ground. For slope, a qualified geotechnical professional does the field verification the city relies on. None of that is legal or engineering advice you should take from a listing, a neighbor or an article, including this one. Use it to know which questions to ask, then get the parcel specific answers from the city and the appropriate professional before your contingency period closes.